During the fifth and sixth day the walls of the first floor and the water-side
porch was removed. Much of the first floor has been cut into pieces and is
ready to leave first thing in the morning.
The house was gone at the end of day 7. The porch is still up to meet Town
requirements. Foundation work should start next week.
|
|
|
Just the porches and the first floor at the end of day 5.
|
|
|
|
|
|
On day 6 the water-side porch comes down
|
|
|
|
The first floor is removed in pieces.
|
|
|
|
|
Just the side porch is left. The first floor is loose and waiting for more dumpsters to arrive.
|
|
|
|
Day 7 - This is all that is left.
|
|
|
|
|
Rot was found in several beams.
|
|
|
|
The last section of flooring is removed. Also note the old cedar post used for support.
|
|
|
|
|
House...what house ?
|
|
|
|
Only the porch is left for now. This was done for zoning compliance.
|
|
|